- Follow Data Center Infrastructure & Critical Facility Evolution on WordPress.com
- 6sigmaDC
- 6SigmaFM
- ace
- airflow
- capacity
- CFD
- cloud
- cooling
- Datacenter
- data center
- data center infrastructure management
- datacenters
- Data Centre
- datacentre
- DCIM
- Design
- digital
- efficiencies
- efficiency
- energy
- engineering
- Facilities
- fragmentation
- future facilities
- infrastructure
- IT
- management
- modeling
- modular
- monitoring
- optimization
- pDCIM
- power
- predict
- Predictive DCIM
- simulation
- uptime
- virtual data center
- Virtual Facility
-
Recent Posts
- Airline Networks: from hub-and-spoke to point-to-point networks
- 3 Ways #DataCenters Can Use #CFD Modeling Right Now
- Science could make fire suppression safe via #datacenter #simulation
- #Datacenter Operational Planning with #Engineering #Simulation
- 10 Most Connected #DataCenters
- How to succeed with The Performance Indicator #datacenter #datacentre @TheGreenGrid @6SigmaDC
- @TheGreenGrid New #DataCenter Metric – Performance Indicator – Explained
- #DataCenter Efficiency – Using #CFD Simulation to Optimize Cooling in Design & Operation
- Airflow Management Can Help #DataCenter Operators Realize Robust Energy Savings
- Data Centers aren’t doing enough to be green
- Uncovering the Value of Calibrating #DataCenter #CFD Models
- Your #datacenter can’t change fast enough
- Future Data Centers are Dynamic…but what about today’s Facilities?
- Applying the Scientific Method in Data Center Management
- Belden to Offer Future Facilities CFD Modeling for Data Centers
- The Fluid #DataCenter : Removing fear from the data center
- #DCIM Correct use of CFD & Engineering Simulation for #DataCenter Operation
- 3 Pillars of Modern #DataCenter Operations
- The start of something great…
- How #datacentres are still under pressure to meet renewable energy goals
- @VaporIO Unveils General Availability of #OpenDCRE @coleinthecloud
- Using CFD and Engineering Simulation Analysis for Product Development in DataCenters
- Modernizing Enterprise #DataCenters for Fun and Profit
- Zombie Servers : They’re Here and Doing Nothing but Burning #Datacenter Energy
- Breaking Design Barriers With #DataCenter Engineering Simulation
- Managing Airflow to Meet the Business Need
- The Mega DataCenter Challenge
- @Afcom @DataCenterWorld Using Simulation to Increase Efficiency, Resiliency, and Capacity
- What is CFD and Engineering Simulation
- Why aren’t #datacenters hotter?
- VIDEO Future Facilities updates 6SigmaDCX – What’s New in Release 9.3
- How to improve DCIM and Monitoring with Engineering Simulation
- Just in Time Design Build Data Centers
- Cooling the Cloud: Binghamton PhD Student Sets Sights on Improving DataCenter Efficiency
- Improving Monitoring with Simulation Part 1 Thermal Mapping
Archives
- June 2017
- April 2017
- November 2016
- October 2016
- September 2016
- August 2016
- July 2016
- May 2016
- April 2016
- March 2016
- February 2016
- January 2016
- December 2015
- September 2015
- August 2015
- July 2015
- June 2015
- May 2015
- April 2015
- March 2015
- February 2015
- January 2015
- December 2014
- November 2014
- October 2014
- September 2014
- August 2014
- July 2014
- June 2014
- May 2014
- April 2014
- March 2014
- February 2014
- January 2014
- December 2013
- November 2013
- October 2013
- September 2013
- August 2013
- July 2013
- June 2013
- May 2013
- April 2013
- August 2012
- July 2012
- June 2012
- May 2012
- April 2012
- March 2012
- February 2012
- January 2012
- December 2011
- November 2011
- October 2011
- September 2011
- August 2011
- July 2011
- June 2011
- May 2011
- April 2011
- March 2011
- February 2011
Tag Archives: efficiencies
451 Recorded Webcast: Why an energy efficient datacenter may not be the most profitable
Watch the video Here Many data center facilities focus on improving the infrastructure efficiency, measured by PUE (Power Utilization Effectiveness), but a single minded focus on that metric will often yield perverse results, such as low equipment utilization, stranded capacity, … Continue reading
Posted in Data Center DCIM Datacenter Datacenters Datacentre
Tagged 451 group, 451 research, 6sigmaDC, 6SigmaFM, Andrew Donoghue, capacity, CFD, data center, data center efficiency, data center facilities, data center infrastructure management, data centers, Data Centre, Datacenter, datacenters, datacentre, DCIM, Design, efficiencies, energy-efficient, fragmentation, future facilities, infrastructure, infrastructure efficiency, IT, jonathan koomey, key performance indicators, kpi, management, monitoring, predict, Predictive DCIM, predictive modeling, predictive modeling for dcim, PUE, sherman ikemoto, simulation, stranded capacity, virtual data center, Virtual Facility
1 Comment
451 Research Webcast: March 4 – Why an energy-efficient data center may not be the most profitable data center
Register Here: http://www.futurefacilities.com/media/info.php?id=251 Many data center facilities focus on improving the infrastructure efficiency, measured by PUE (Power Utilization Effectiveness), but a single minded focus on that metric will often yield perverse results, such as low equipment utilization, stranded capacity, and wasted … Continue reading
Posted in Data Center DCIM Datacenter Datacenters Datacentre
Tagged 451, 451 research, 6sigmaDC, 6SigmaFM, Andrew Donoghue, capacity, CFD, data center, data center efficiency, data center facilities, data center infrastructure management, data centers, Data Centre, Datacenter, datacenters, datacentre, DCIM, Design, efficiencies, energy-efficient, fragmentation, future facilities, infrastructure, infrastructure efficiency, IT, jonathan koomey, key performance indicators, kpi, management, monitoring, predict, Predictive DCIM, PUE, sherman ikemoto, simulation, stranded capacity, uptime, uptime institute, virtual data center, Virtual Facility
Leave a comment
Our friends at 451 Research are conducting an end user DCIM survey This is a survey for end users of a commercially available datacenter infrastructure management (DCIM) system. The goal of this research is to better understand the end-user experience … Continue reading
Link
January 10, 2014
Tagged 451, 6sigmaDC, 6SigmaDCIM, 6SigmaFM, ace, ACE Assessment, Action, afcom, airflow, ASHRAE, assess, assessment, automation, availability, baseline, bms, booth, box, budgets, Building, built out, cabling, calculate, capabilities, capacity, capacity problem, CFD, CFS, challenge, chris wade, cloud, compute, compute capacity, computer hall, computer room, confidence, configuration, construction, control, converged, cooling, cost, Critical Facilities Summit, data center, data center capacity, Data Center DCIM Datacenter Datacenters Datacentre and tagged 3D, data center infrastructure management, data center knowledge, data center manager, data center managers, Data Center World, Data Centre, Datacenter, datacenter capacity, datacenters, datacentre, dcam, DCIM, decisions, demo, deploy, deployment, deployments, Design, designers, developing, digital, download, downtime, dynamic, efficiencies, efficiency, electronics, energy, engineer, engineering, Enough, environmental, f data center design and operational management software, Facilities, facility, financial, fixing, focus, fragmentation, Future, future facilities, FutureFacilities, gap, gartner, global scale, goals, GW, impact, improve, indicators, infrastructure, introduction, Inventory Management, ipad, IT, IT assets, itam, kleyman, LinkedIn, live, Load, lost, lost capacity, magnitude, maintaining, management, maximize, measure, Measure Their Performance Gap, mechanical, mini, mission critical, modeling, modelling, models, modular, monitoring, Monitoring & Alerting, NC, open dcim, operation, operational, operations, operators, optimization, optimizing, orlando, overview, ower, paper, pDCIM, performance, performance gap, performance metric, performing, pilot, planning, power, power. cooling, predict, prediction, Predictive, Predictive DCIM, Predictive DCIM in Action, predictive model, predictive modeling, PredictiveDCIM, presentation, prevent, proactive, problem, PUE, real, real time, reclaiming, recording, reporting, reports, Research, resilience, resources, response, return, robert schmidt, room, score, server, servers, service, sherman ikemoto, Simulate, simulation, software, solve, space, spreadsheets, techniques, temperature, temperatures, today, track, tracking, transfer, undetected, unveiling, uptime, utilization, video, virtual, virtual data center, Virtual Facility, webcast, Webcast Recording, white, white paper, white space, whitepaper, youtube
Leave a comment
Reclaim Lost Capacity In Your Data Center – It Starts With An Approach That Combines The Best of Engineering and IT
Originally posted on Data Center Infrastructure & Critical Facility Evolution:
Reclaim Lost Capacity In Your Data Center – It Starts With An Approach That Combines The Best of Engineering and IT A funny thing happened to data centers during the…
Posted in Data Center DCIM Datacenter Datacenters Datacentre
Tagged 6sigmaDC, 6SigmaDCIM, 6SigmaFM, ace, ACE Assessment, Action, afcom, airflow, ASHRAE, assess, assessment, automation, availability, baseline, bms, booth, box, budgets, Building, built out, cabling, calculate, capabilities, capacity, capacity problem, CFD, CFS, challenge, chris wade, cloud, compute, compute capacity, computer hall, computer room, confidence, configuration, construction, control, converged, cooling, cost, Critical Facilities Summit, data center, data center capacity, Data Center DCIM Datacenter Datacenters Datacentre and tagged 3D, data center infrastructure management, data center knowledge, data center manager, data center managers, Data Center World, Data Centre, Datacenter, datacenter capacity, datacenters, datacentre, dcam, DCIM, decisions, demo, deploy, deployment, deployments, Design, designers, developing, digital, download, downtime, dynamic, efficiencies, efficiency, electronics, energy, engineer, engineering, Enough, environmental, f data center design and operational management software, Facilities, facility, financial, fixing, focus, fragmentation, Future, future facilities, FutureFacilities, gap, gartner, global scale, goals, GW, impact, improve, indicators, infrastructure, introduction, Inventory Management, ipad, IT, IT assets, itam, kleyman, LinkedIn, live, Load, lost, lost capacity, magnitude, maintaining, management, maximize, measure, Measure Their Performance Gap, mechanical, mini, mission critical, modeling, modelling, models, modular, monitoring, Monitoring & Alerting, NC, open dcim, operation, operational, operations, operators, optimization, optimizing, orlando, overview, ower, paper, pDCIM, performance, performance gap, performance metric, performing, pilot, planning, power, power. cooling, predict, prediction, Predictive, Predictive DCIM, Predictive DCIM in Action, predictive model, predictive modeling, PredictiveDCIM, presentation, prevent, proactive, problem, PUE, real, real time, reclaiming, recording, reporting, reports, resilience, resources, response, return, robert schmidt, room, score, server, servers, service, sherman ikemoto, Simulate, simulation, software, solve, space, spreadsheets, techniques, temperature, temperatures, today, track, tracking, transfer, undetected, unveiling, uptime, utilization, video, virtual, virtual data center, Virtual Facility, webcast, Webcast Recording, white, white paper, white space, whitepaper, youtube
Leave a comment
Predictive Modeling for DCIM in Action – All about Data Center Capacity
Webcast Recording – Predictive DCIM in Action Power, IT assets, PUE and temperatures are the focus of data center monitoring today. But, DATA CENTER CAPACITY (the ability of the facility to support IT equipment) is being overlooked. At any point … Continue reading
Posted in Data Center DCIM Datacenter Datacenters Datacentre
Tagged 6sigmaDC, 6SigmaDCIM, 6SigmaFM, ace, ACE Assessment, Action, afcom, airflow, ASHRAE, assess, assessment, automation, availability, baseline, bms, booth, box, budgets, Building, built out, cabling, calculate, capabilities, capacity, capacity problem, CFD, CFS, challenge, chris wade, cloud, compute, compute capacity, computer hall, computer room, confidence, configuration, construction, control, converged, cooling, cost, Critical Facilities Summit, data center, data center capacity, Data Center DCIM Datacenter Datacenters Datacentre and tagged 3D, data center infrastructure management, data center knowledge, data center manager, data center managers, Data Center World, Data Centre, Datacenter, datacenter capacity, datacenters, datacentre, dcam, DCIM, decisions, demo, deploy, deployment, deployments, Design, designers, developing, digital, download, downtime, dynamic, efficiencies, efficiency, electronics, energy, engineer, engineering, Enough, environmental, f data center design and operational management software, Facilities, facility, financial, fixing, focus, fragmentation, Future, future facilities, FutureFacilities, gap, gartner, global scale, goals, GW, impact, improve, indicators, infrastructure, introduction, Inventory Management, ipad, IT, IT assets, itam, kleyman, LinkedIn, live, Load, lost, lost capacity, magnitude, maintaining, management, maximize, measure, Measure Their Performance Gap, mechanical, mini, mission critical, modeling, modelling, models, modular, monitoring, Monitoring & Alerting, NC, open dcim, operation, operational, operations, operators, optimization, optimizing, orlando, overview, ower, paper, pDCIM, performance, performance gap, performance metric, performing, pilot, planning, power, power. cooling, predict, prediction, Predictive, Predictive DCIM, Predictive DCIM in Action, predictive model, predictive modeling, PredictiveDCIM, presentation, prevent, proactive, problem, PUE, real, real time, reclaiming, recording, reporting, reports, resilience, resources, response, return, robert schmidt, room, score, server, servers, service, sherman ikemoto, Simulate, simulation, software, solve, space, spreadsheets, techniques, temperature, temperatures, today, track, tracking, transfer, undetected, unveiling, uptime, utilization, video, virtual, virtual data center, Virtual Facility, webcast, Webcast Recording, white, white paper, white space, whitepaper, youtube
Leave a comment
Future Facilities Announces New ACE Assessment Service to Help Data Center Managers Measure Their Performance Gap
Future Facilities Announces New ACE Assessment Service to Help Data Center Managers Measure Their Performance Gap Service offering identifies three variables that measure success and failure of a data center’s operations Future Facilities, Inc., a leading provider of data center design … Continue reading
Posted in Data Center DCIM Datacenter Datacenters Datacentre
Tagged 6sigmaDC, 6SigmaDCIM, 6SigmaFM, ace, ACE Assessment, afcom, airflow, ASHRAE, assess, assessment, automation, availability, baseline, bms, booth, box, budgets, Building, cabling, calculate, capabilities, capacity, capacity problem, CFD, CFS, challenge, chris wade, cloud, compute, compute capacity, computer hall, computer room, confidence, construction, control, converged, cooling, cost, Critical Facilities Summit, data center, data center capacity, Data Center DCIM Datacenter Datacenters Datacentre and tagged 3D, data center infrastructure management, data center knowledge, data center manager, data center managers, Data Center World, Data Centre, Datacenter, datacenter capacity, datacenters, datacentre, DCIM, decisions, demo, deploy, deployment, deployments, Design, designers, developing, digital, download, downtime, dynamic, efficiencies, efficiency, electronics, energy, engineer, engineering, Enough, environmental, f data center design and operational management software, Facilities, facility, financial, fixing, fragmentation, Future, future facilities, gap, gartner, global scale, goals, GW, impact, improve, indicators, infrastructure, introduction, Inventory Management, ipad, IT, kleyman, LinkedIn, live, Load, lost, lost capacity, magnitude, maintaining, management, maximize, measure, Measure Their Performance Gap, mechanical, mini, mission critical, modeling, modelling, models, modular, monitoring, Monitoring & Alerting, NC, open dcim, operation, operational, operations, operators, optimization, optimizing, orlando, overview, paper, pDCIM, performance, performance gap, performance metric, performing, pilot, planning, power, power. cooling, predict, prediction, Predictive, Predictive DCIM, predictive model, predictive modeling, PredictiveDCIM, presentation, prevent, problem, PUE, real, real time, reporting, reports, resilience, resources, response, return, robert schmidt, room, score, server, servers, service, sherman ikemoto, Simulate, simulation, software, solve, space, spreadsheets, techniques, temperature, track, tracking, transfer, undetected, unveiling, uptime, utilization, video, virtual, virtual data center, Virtual Facility, webcast, white, white paper, white space, whitepaper, youtube
Leave a comment